• Hubungi Kami
Sabah Okay
  • Laman Utama
  • Berita
  • Sukan
  • Hiburan
  • Hubungi Kami
No Result
View All Result
  • Laman Utama
  • Berita
  • Sukan
  • Hiburan
  • Hubungi Kami
No Result
View All Result
Sabah Okay
No Result
View All Result
Home Berita

Tender For Jalan Lok Kawi Upgrading To Open In January 2025 – Armizan

November 9, 2024
in Berita
Reading Time: 2 mins read
Fokus Selesai Masalah Rakyat Sebelum Fikir PRN Sabah – Armizan
16
SHARES
125
VIEWS
Share on FacebookShare on Twitter
Share this news!

PAPAR, Nov 9 (Bernama) — The tender for the upgrading of Jalan Lok Kawi will be opened by January 2025 to address the traffic congestion in the area, said Papar Member of Parliament Datuk Armizan Mohd Ali.

The Minister of Domestic Trade and Cost of Living said that the open tender is being advertised to companies interested in upgrading the existing road from a two-lane to a four-lane dual carriageway.

Related articles

PETRA laksana 86 projek pembangunan di Sabah melibatkan peruntukan RM8.8 bilion

PETRA laksana 86 projek pembangunan di Sabah melibatkan peruntukan RM8.8 bilion

July 14, 2025
Fadillah Yusof pengerusikan Mesyuarat Jawatankuasa Teknikal Khas MA63 Sabah esok 

Fadillah Yusof pengerusikan Mesyuarat Jawatankuasa Teknikal Khas MA63 Sabah esok 

July 13, 2025

“I have proposed and appealed to the Ministry of Works (KKR) earlier to finalise the design (for the road construction) as soon as possible. If the tender process could be in December, let it be so.

“However, their (KKR) commitment is by January at the latest, and it will take time for the tender evaluation. So, we hope that by April or May, the contractor will be able to start work,” he told reporters after conducting an inspection of Jalan Sabindo and a briefing with KKR at Kampung Suangon today.

In May, Prime Minister Datuk Seri Anwar Ibrahim, in his speech at the Program Semarak Perpaduan Rakyat in Papar, announced the Jalan Lok Kawi upgrading project from the Sabindo roundabout to Sungai Kinarut Papar (RM67 million) and the Pengalat-Papar Bypass Road Project (RM538 million).

Armizan said the projects are expected to be completed within three years, and he hopes that district officers will assist the Ministry of Works (KKR) and other relevant agencies to ensure the construction process proceeds smoothly, including negotiations with the local villagers affected by the roadworks.

He added that the upgrading of the road is an urgent necessity, as a 2021 KKR study found that an estimated 27,000 vehicles use the route from Papar to the city centre each day.

“The stretch (for the tender that has been advertised) is about 1.3 kilometres, from the Sabindo roundabout to the Sekolah Menengah Kebangsaan Kinarut,” he said, adding that the RM67 million cost also includes the construction of a pedestrian bridge, utilities, and land acquisition.

Meanwhile, the Pengalat-Papar Bypass Road project is currently undergoing consultant evaluation, which will be completed this month, before moving on to the next phase, as it requires finding an alternative solution to be implemented within the allocated budget.

He noted the need to build a new bridge to ease the movement of people around Papar and reduce traffic congestion.

“This second project involves two components: a new alignment and the upgrading of the existing road,” he said.

 

 

Share this news!
Tags: Lok KawiPaparroadSabahupgrading
Share6Tweet4

Related Posts

PETRA laksana 86 projek pembangunan di Sabah melibatkan peruntukan RM8.8 bilion

PETRA laksana 86 projek pembangunan di Sabah melibatkan peruntukan RM8.8 bilion

July 14, 2025

Kota Kinabalu : Kementerian Peralihan Tenaga dan Transformasi Air  (PETRA) memperuntukkan sebanyak RM8.799 bilion sehingga Jun lalu bagi pelaksanaan 86...

Fadillah Yusof pengerusikan Mesyuarat Jawatankuasa Teknikal Khas MA63 Sabah esok 

Fadillah Yusof pengerusikan Mesyuarat Jawatankuasa Teknikal Khas MA63 Sabah esok 

July 13, 2025

Read Time:48 Second Kota Kinabalu : Timbalan Perdana Menteri, Datuk Seri Fadillah Yusof dijadual akan mempengerusikan Mesyuarat Jawatankuasa Teknikal Khas...

Jentera akar umbi Gagasan Rakyat Silam digembleng demi kebajikan rakyat

Jentera akar umbi Gagasan Rakyat Silam digembleng demi kebajikan rakyat

July 13, 2025

Oleh Sitti Nor Azizah Talata LAHAD DATU: Parti Gagasan Rakyat Sabah (Gagasan Rakyat) Bahagian Silam terus memperkukuh peranannya di peringkat...

Penjawat awam dinasihat amalkan gaya hidup sihat

Penjawat awam dinasihat amalkan gaya hidup sihat

July 13, 2025

Kota Kinabalu : Penjawat awam dinasihatkan agar sentiasa mengamalkan gaya hidup sihat demi memberikan perkhidmatan terbaik kepada rakyat. Timbalan Ketua...

Sabah’s oil and gas gains built on reforms, not rhetoric — Dr Roland

Sabah’s oil and gas gains built on reforms, not rhetoric — Dr Roland

July 13, 2025

Dr Roland KOTA KINABALU (July 13): The Sabah government’s progress in the oil and gas sector is grounded in facts...

Load More

TERBARU

PETRA laksana 86 projek pembangunan di Sabah melibatkan peruntukan RM8.8 bilion

PETRA laksana 86 projek pembangunan di Sabah melibatkan peruntukan RM8.8 bilion

July 14, 2025
Warisan Kaamatan June 24

Only Warisan Can Deliver Political Independence for Sabah

July 14, 2025
Fadillah Yusof pengerusikan Mesyuarat Jawatankuasa Teknikal Khas MA63 Sabah esok 

Fadillah Yusof pengerusikan Mesyuarat Jawatankuasa Teknikal Khas MA63 Sabah esok 

July 13, 2025
Jentera akar umbi Gagasan Rakyat Silam digembleng demi kebajikan rakyat

Jentera akar umbi Gagasan Rakyat Silam digembleng demi kebajikan rakyat

July 13, 2025
Penjawat awam dinasihat amalkan gaya hidup sihat

Penjawat awam dinasihat amalkan gaya hidup sihat

July 13, 2025

POPULAR

  • Revitalising Sabah’s Tourism Industry: Addressing Key Challenges

    Revitalising Sabah’s Tourism Industry: Addressing Key Challenges

    19 shares
    Share 8 Tweet 5
  • Likas villagers to be relocated to new permanent settlement

    19 shares
    Share 8 Tweet 5
  • Buaya tembaga baham lembu ditembak mati

    18 shares
    Share 7 Tweet 5
  • Traffic summons discount at Sabah MADANI Rakyat programme

    18 shares
    Share 7 Tweet 5
  • 625 graduate from eight Sabah community colleges

    17 shares
    Share 7 Tweet 4

Dapatkan berita-berita politik, viral atau apa sahaja di sini. Kamu pun boleh rekomen apa-apa yang patut kami siarkan di laman kami. 

TERBARU

PETRA laksana 86 projek pembangunan di Sabah melibatkan peruntukan RM8.8 bilion

Only Warisan Can Deliver Political Independence for Sabah

Fadillah Yusof pengerusikan Mesyuarat Jawatankuasa Teknikal Khas MA63 Sabah esok 

Jentera akar umbi Gagasan Rakyat Silam digembleng demi kebajikan rakyat

Penjawat awam dinasihat amalkan gaya hidup sihat

Sabah’s oil and gas gains built on reforms, not rhetoric — Dr Roland

  • Hubungi Kami

© JNews Crafted with love by – Jegtheme.

No Result
View All Result
  • Laman Utama
  • Berita
  • Sukan
  • Hiburan
  • Hubungi Kami

© 2024 SabahOkay.com